Manchester Waste PFI

 

 

Pound
Project Value
£4m
Crane
Industry Sector
Civils
Workman
Client Company
Costain Limited
Calendar
Project Timescale
2009 – 2013
Image11
Image1
Image2
Image4
Image5
Image6
Image10
Image9

Costain acting as the main construction contractor for the Greater Manchester Waste PFI contract to design and constructed 44 new waste facilities across the Greater Manchester area.

Westshield were appointed as a specialist sub-contractor on the major schemes throughout the  PFI Contract.

The Technical Aspect:

Longley Lane MBT & HWRC, Sharston:

  • Roads & Sewers
  • Groundworks
  • External works
  • Surfacing
  • Ducting
  • Manholes
  • Bulk excavation & cart-away
  • 4000m² hardstanding & laydown areas for process contractors

Boynsope Wharf HWRC, Irlam

  • Roads & Sewers
  • External works
  • Deep drainage (up to 450 diameter pipes)
  • Pumping station & rising mains
  • Bulk excavation and disposal
  • 3500m² hardstanding areas
  • 3500m² car park

Reliance Street, Newton Heath – Enabling Works

  • Site strip of existing top soil and stockpile
  • Cut and fill to site compound area approx 1350m²
  • Terram to access road / car parking / exit approx 1350m²
  • Place 6F2 Material 150mm thick 1350m²
  • Place MOT type 1 material over parking area and access
  • Excavate and construct foundation pads for cabins
  • All associated drainage works for compound set up