Saltra, Elmira Way

 

 

Pound
Project Value
£1.5m+
Crane
Industry Sector
Civil Engineering and Reinforced Concrete Structures
Workman
Client Company
Elan Homes
Calendar
Project Timescale
12-18 Months Per Block
WP 20150414 17 10 39 Pro
WP 20150414 17 03 39 Pro
E28ED4EA 38C5 41FC B3FC E7C070848A09
E00E41E7 3CC4 4CAC A7E3 EC99857EBDEF
CFB01FF5 8E99 4C85 975F 9717B8E2A5F5
51CDBE3B B5E8 4EC7 8F5D 9916C657BE64
6E0FAB22 BB04 4C16 A4A9 D04EB407FF95
64C7158F 049D 477B B6EC 88A3329CEA06

Westshield were appointed by Elan Homes to carry out the construction of three apartment blocks and car park to compliment.

The Technical Aspect:

Westshields activity schedule on site consisted of the following:-

  • Mobilisation onto site
  • Scraping of existing pile mat and CA
  • Installation of attenuation tank
  • Cropping and removal of Pile Caps
  • Site clearance and ground prep
  • Installation of pile mat
  • Attendance on piling company
  • Fixing of reinforcement for Groundslab, Podium and Substation
  • Waterproofing for substation
  • Excavating pile caps and ground beams
  • Formwork for in situ concrete
  • Aggregate and compaction to floor slab undercroft
  • Formwork and fabric reinforcement to floor slab
  • Brushed finish to undercroft slab
  • Formed joints to undercroft slab
  • Supply, install and strike formwork to concrete
  • Upstands
  • Columns
  • Walls – Supply, install and strike formwork
  • Walls – Finishing
  • Float Finish to Podium Slab & Upstands
  • Isolation Joints
  • Surface Water Drainage
  • Foul Water Drainage
  • Installation of Hydrobrake & Manholes
  • Installation of Aco Multidrain into dock wall
  • Installation of substation
  • Removal of non hazardous spoil
  • Installation of ducting