The Chichester Street project based in Rochdale, involves the construction of a
new waste transfer facility on the footprint of a former Invessel Composting (IVC) plant.

The scope of works also includes ducting & drainage, a fire suppression system with two new firewater tanks, installation of a permanent wheel wash, an atomiser system of dust and odour control, roller shutter doors and fast acting curtain doors.

The Technical Aspect:

The works comprised an FRC package on a plant and labour basis, for concrete slabs, internal walls and push walls.

The activity schedule consisted of the following:-

  • Breaking down of piles
  • Steel fixing
  • Formwork
  • Concrete works