Earnsdale WwTW

Project Value
£2.2m

Industry Sector
Water & Wastewater

Client Company
United Utilities

Project Timescale
40 weeks







The service reservoirs are located near Darwin within the Pennine Moor SSSI.
A substantial earth slope slippage occurred in 2017 which required stabilisation to secure the reservoirs.
The Technical Aspect:
- Sensitive clearance of existing failed slope
- Gabion and revetments protection to brook, with runoff controls
- Importing of 8000m3 of engineered fill to form new 15m high slope
- Locate and identify existing pipelines around the 2 service reservoirs
- Install new interconnecting pipework and valves to provide isolation between cells
- Remove and demolish generator building, fuel tanks and septic tank