Hotel Football, Old Trafford

Project Value
£500,000+

Industry Sector
Civil Engineering

Client Company
Galliford Try

Project Timescale
3-6 Months








Highway construction – section 278 works.
Scope of works undertaken:
- Reconstruction of footpaths, junction improvements and carriageway upgrade
- Traffic signalisation upgrade
- New installation of traffic islands on 4-way junction (dual carriageway)
- Construction of new entrances to the hotel including new block paved road
- Resurfacing of all dual carriageway, junction and entrance road to MUFC Stadium
The Technical Aspect:
The works package comprised of:-
- FRC
- Surface Water Drainage
- External works
- Surfacing
The scope of works included the following:-
- Sewer connections
- Gully Connections and installation of S.W. pipework and manholes
- Reduce level excavation and removal
- Foundations and RC slabs
- FRC works to retaining walls, slabs and upstands
- Ducting and Street lighting installation
- Traffic Signal Installation works
- Formation of car parking areas and roads
- Hard landscaping – kerbing, paving (block paved areas and flagging), installation of feature bollards
- Adjusting and installing all new iron work to carriageway and footways
- Planing off existing carriageway
- Surfacing to existing carriageway, new roads, footpaths and 4-way junction
- Handrail and Central reservation road barrier installation
- White-lining