Hotel Football, Old Trafford

 

 

Pound
Project Value
£500,000+
Crane
Industry Sector
Civil Engineering
Workman
Client Company
Galliford Try
Calendar
Project Timescale
3-6 Months
WP 20150218 13 24 02 Pro
WP 20150218 13 22 22 Pro
WP 20150207 12 29 39 Pro
WP 20150207 12 29 10 Pro
WP 20150207 12 33 41 Pro
WP 20150207 12 36 13 Pro
WP 20150207 12 10 06 Pro
WP 20150207 12 11 25 Pro

Highway construction – section 278 works.

Scope of works undertaken:

  • Reconstruction of footpaths, junction improvements and carriageway upgrade
  • Traffic signalisation upgrade
  • New installation of traffic islands on 4-way junction (dual carriageway)
  • Construction of new entrances to the hotel including new block paved road
  • Resurfacing of all dual carriageway, junction and entrance road to MUFC Stadium

The Technical Aspect:

The works package comprised of:-

  • FRC
  • Surface Water Drainage
  • External works
  • Surfacing

The scope of works included the following:-

  • Sewer connections
  • Gully Connections and installation of S.W. pipework and manholes
  • Reduce level excavation and removal
  • Foundations and RC slabs
  • FRC works to retaining walls, slabs and upstands
  • Ducting and Street lighting installation
  • Traffic Signal Installation works
  • Formation of car parking areas and roads
  • Hard landscaping – kerbing, paving (block paved areas and flagging), installation of feature bollards
  • Adjusting and installing all new iron work to carriageway and footways
  • Planing off existing carriageway
  • Surfacing to existing carriageway, new roads, footpaths and 4-way junction
  • Handrail and Central reservation road barrier installation
  • White-lining