Linglongs Road, Whaley Bridge

 

 

Pound
Project Value
£650,000+
Crane
Industry Sector
Civil Engineering and S278 Works
Workman
Client Company
Barratt Homes
Calendar
Project Timescale
Ongoing
DJI 0558
C0FD9A28 A889 4578 93E1 8985A7718EA8
C1EDAA9E 7C15 43D1 8784 9B1DD7837BBF
1617793736051
023BDCD8 FF3B 4D01 8BBA 78733C4A14BA
IMG 5645
IMG 5622
IMG 4647

Westshield have been appointed by long-standing client, Barratt Homes, to carry out S278 Works on new housing development where Westshield will be undertaking the following:

  • S278 Works
  • New Site Entrance
  • Earthworks
  • Site Preparation
  • New Site Compound
  • Sales Area
  • Temporary Car Parking
  • Roads & Sewers Infrastructure
  • Retaining Walls
  • Piling Mats
  • Piling
  • Installation of RC T-Beam System
  • Groundworks

The Technical Aspect:

Westshield scope of works consisted of the following:

  • Sewer connections
  • Gully Connections and installation of S.W. pipework and manholes
  • Reduce level excavation and removal
  • Hard landscaping – kerbs, pavings an edgings
  • Planing off existing road
  • Surfacing to existing road and footpaths