M6, Jnc 13-15 Bridgeworks

 

 

Pound
Project Value
£1m+
Crane
Industry Sector
Civil Engineering and Reinforced Concrete Structures
Workman
Client Company
Kier
Calendar
Project Timescale
9-12 Months
3BD66A91 55B3 4435 BE30 628F43E56397
Picture1
Picture2
FF7483D0 7429 4FC9 8839 5653E54BC14E
E0FAE9BA C653 45CF BBAC 05693060D25C
4468B472 5059 4986 8062 37C806F9EA9B
870DF591 6AAA 4C01 B766 D8E62628E6EA
6F3585A6 0066 49E4 8222 7DF5B47B6B09

Westshield were appointed by Kier to carry out works in numerous locations on site.

The Technical Aspect:

Norton Railway Bridge

  • Series 200 – Site Clearance
  • Series 500 – Drainage and Service Ducts
  • Fin Drains and Narrow Filter Drains
  • Drainage and Service Ducts in Structures (Including Reinforced Earth Structures and Anchored Earth Structures)
  • Trench for communication duct in line with method of measurement 225mm x 300mm
  • Trench for communication duct in line with method of measurement 300mm x 1.39m
  • Series 600 – Earthworks
  • Excavation
  • Disposal of Material
  • Imported Fill
  • Compaction of Fill
  • Series 1100 – Kerbs, Footways and Paved Areas
  • Kerbs, Channels, Edgings, Combined Drainage and Kerb Blocks and Linear Drainage Channel Systems
  • Series 1700 – Structural Concrete
  • In situ Concrete
  • Surface Finish of Concrete – Formwork
  • Steel Reinforcement for Structures
  • Series 2000 – Waterproofing for Structures
  • Series 2300 – Bridge Expansion Joints and Sealing of Gaps

Junction 14 (Stafford North Bridge) North

  • Series 200 – Site Clearance
  • Series 600 – Earthworks
  • Excavation
  • Disposal of Material
  • Imported Fill
  • Compaction of Fill
  • Series 1100 – Kerbs, Footways and Paved Areas
  • Kerbs, Channels, Edgings, Combined Drainage and Kerb Blocks and Linear Drainage Channel Systems
  • Series 1700 – Structural Concrete
  • In situ Concrete
  • Surface Finish of Concrete – Formwork
  • Steel Reinforcement for Structures
  • Series 2000 – Waterproofing for Structures
  • Removal of Existing Waterproofing
  • Series 2300 – Bridge Expansion Joints and Sealing of Gaps

Junction 14 (Stafford North Bridge) South

  • Series 200 – Site Clearance
  • Series 400 – Road Restraint Systems (Vehicle and Pedestrian)
  • Vehicle Parapets
  • Series 600 – Earthworks
  • Excavation
  • Disposal of Material
  • Imported Fill
  • Compaction of Fill
  • Series 1100 – Kerbs, Footways and Paved Areas
  • Kerbs, Channels, Edgings, Combined Drainage and Kerb Blocks and Linear Drainage Channel Systems
  • Footways and Paved Areas
  • Series 1700 – Structural Concrete
  • In situ Concrete
  • Surface Finish of Concrete – Formwork
  • Steel Reinforcement for Structures
  • Series 2000 – Waterproofing for Structures
  • Removal of Existing Waterproofing
  • Series 2300 – Bridge Expansion Joints and Sealing of Gaps