Northwich WwTW

 

 

Pound
Project Value
£400,000+
Crane
Industry Sector
Water & Wastewater
Workman
Client Company
Advance JV
Calendar
Project Timescale
3-6 Months
7506B5B0 D017 4EAD B77A 6133300AC67E
14AB1A46 5437 4172 8B8B E32DCF6449B1
33100E7B D657 4D44 B507 2C8364C043AD
3FBDA254 DBB3 4DAD 8AEC 883CB61B34CF
15E3B211 A8D1 43D6 9FDD 74CB8A6F7423
CAC8DD3E BFEE 4142 8DCB 78D1F71C6E5D
IMG 1844
IMG 2024

Westshield working in partnership with Advance JV for United Utilities to undertake Storm Tank Conversion FRC Works.

The Technical Aspect:

Westshield scope of works consisted of the following:

  • Mobilisation onto site
  • Removal of Redundant Steel
  • Fill to Hopper
  • Build Shutters to Walls
  • Reinforcement to Base and Walls
  • Concrete to Walls
  • Connection Channel between PST
  • Modifications to Outlet Chambers
  • Storm Diversion Chamber
  • Pipework PST to Existing Sludge Well
  • Reinstatement of Concrete Footpaths
  • Installation of Access Stairs and Pipe Plinths
  • Installation of Ducting