Pomona Strand, Manchester Waters

 

ter

Pound
Project Value
£2.5m+
Crane
Industry Sector
Civil Engineering and Reinforced Concrete Structures
Workman
Client Company
Vermont
Calendar
Project Timescale
2019-2021
D2A14523 01AF 4EED B291 84139049A13C
E886F65F 6C3C 41F5 B9CB D0C8ED47B8D2
IMG 6183
CF36EDBA A9FA 4530 910E 29191A24AA98
49042FCD B49F 4282 B28B 6A2DA8B7B4E3
71035DF6 AA4B 4848 8ABE 59EF9F8B7D2F
BA312678 AC98 465A AA6E B62F5B9ED5CE
F65AADEA 2CED 4DB9 BE5F 5347B6F7CD56

Westshield were appointed by Vermont to carry out the full FRC package throughout numerous phases.

The Technical Aspect:

Westshields activity schedule on site consisted of the following:-

  • Mobilisation onto site
  • Scraping of existing pile mat and CA
  • Installation of attenuation tank
  • Cropping and removal of pile caps
  • Site clearance and ground prep
  • Installation of pile mat
  • Attendance on piling company
  • Fixing of reinforcement for Groundslab, Podium and Substation
  • Waterproofing for substation
  • Excavating pile caps and ground beams
  • Formwork for in situ concrete
  • Aggregate and compaction to floor slab undercroft
  • Formwork and fabric reinforcement to floor slab
  • Brushed finish to undercroft slab
  • Formed joints to undercroft slab
  • Supply, install and strike formwork to concrete
  • Upstands
  • Columns
  • Walls – Supply, install and strike formwork
  • Walls – Finishing
  • Float Finish to Podium Slab & Upstands
  • Isolation Joints
  • Surface Water Drainage
  • Foul Water Drainage
  • Installation of Hydrobrake & Manholes
  • Installation of Aco Multidrain into dock wall
  • Installation of substation
  • Removal of non hazardous spoil
  • Installation of ducting