Highway construction – section 278 works.

Scope of works undertaken:

  • Traffic management to the A556
  • Reconstruction of existing footpaths.
  • Installation of a New Entrance Junction and carriageway upgrade
  • New installation of traffic islands on 4-way junction (dual carriageway)
  • Construction of New Site Entrance Works
  • Resurfacing of the existing dual carriageway, New Junction, Site Entrance, Footpaths and Entrance Road

The Technical Aspect:

The works package comprised of:-

  • Traffic Management
  • Surface Water Drainage
  • External works
  • Surfacing

The scope of works included the following:-

  • Sewer connections
  • Gully Connections and installation of S.W. pipework and manholes
  • Reduce level excavation and removal
  • Ducting and Street lighting installation
  • Installation of New Signage
  • Formation of car parking areas and roads
  • Hard/Soft landscaping – kerbing, paving, edgings, top-soil, seeding and planting
  • Adjusting and installing all new iron work to carriageway and footways
  • Planing off existing carriageway
  • Surfacing to existing carriageway, new roads, footpaths and New Junction
  • Handrail and Central reservation road barrier installation
  • White-lining